JDCC steel structure manufacturing facilities and completed industrial project

Knowledge Base

Test Method For Welding Performance Of Steel Structure - JDCC knowledge image 15 2025/4

Test Method For Welding Performance Of Steel Structure

Good welding performance,steel structure means that under certain welding process conditions,the weld metal of the steel structure and the nearby base metal will not produce cracks.Welding performance in the serviceabil…

Read more
Key Selection Factors for Steel Structure Building - JDCC knowledge image 13 2025/4

Key Selection Factors for Steel Structure Building

1. Local fire code: buildings with ignition sources or public occupancy usually require A-grade (rockwool / glass wool) 2. Climate: cold zones need thicker insulation (e.g., 100–150mm rockwool); tropical zones need refl…

Read more
FAQ for Steel Structure Warehouse Buyers - JDCC knowledge image 10 2025/4

FAQ for Steel Structure Warehouse Buyers

Q: Does buyer need to provide installation team? A: Not necessarily — Qingdao Jingdao Credit Construction Steel Structure Co.,Ltd.(JDCC)offers a complete steel construction solution ranging from detailing to on-site ere…

Read more
Typical Timeline for 2000㎡ Steel Structure Workshop - JDCC knowledge image 08 2025/4

Typical Timeline for 2000㎡ Steel Structure Workshop

1. Foundation curing: 3–4 weeks (weather dependent) 2. Steel erection: 10–15 working days with 6–8 workers + crane...

Read more
Quality Control Points Steel Building Buyers Should Monitor - JDCC knowledge image 06 2025/4

Quality Control Points Steel Building Buyers Should Monitor

1.Bolt torque values recorded per connection group 2.Panel screw spacing and sealing quality...

Read more
Enclosure & Finishing of Steel Building - JDCC knowledge image 04 2025/4

Enclosure & Finishing of Steel Building

Enclosure & Finishing of Steel Building(Week 3–4) 1.Roof panel installation: start from eave, overlap direction against prevailing wind...

Read more
Main Frame Erection of Steel Building - JDCC knowledge image 02 2025/4

Main Frame Erection of Steel Building

Main Frame Erection of Steel Building (Week 1–2) 1.Column installation: lift, align, temporary bracing...

Read more
Pre-Installation Preparation prior to the construction of Steel Building - JDCC knowledge image 31 2025/3

Pre-Installation Preparation prior to the construction of Steel Building

Pre-Installation Preparation prior to the construction of Steel Building(Week 0) 1.Site leveling and foundation curing (anchor bolts positioned per shop drawing)...

Read more
FAQ for New Steel Space Frame Building Buyers - JDCC knowledge image 29 2025/3

FAQ for New Steel Space Frame Building Buyers

Q: Are space frames more expensive than portal frames? A: For spans below 30m, portal frames are usually cheaper. Above 40–50m span, space frames become the economical and sometimes the only feasible option...

Read more
Cost Estimation Basics of Steel Space Frame Building - JDCC knowledge image 27 2025/3

Cost Estimation Basics of Steel Space Frame Building

Space frame cost is driven by: span length, grid module, node type, surface area curvature, and loading. Budget roughly...

Read more
Key Engineering Checks for Steel Space Frame Building Buyers - JDCC knowledge image 25 2025/3

Key Engineering Checks for Steel Space Frame Building Buyers

1.Node connection design and bolt grade confirmation (8.8 / 10.9 high-strength bolts) 2.Wind uplift and snow load calculation per local code...

Read more
Two Main Node Systems about Steel Space Frame - JDCC knowledge image 23 2025/3

Two Main Node Systems about Steel Space Frame

1.Bolted spherical node (Mero-type): steel tubes converge at a machined sphere, connected by high-strength bolts. Fast fabrication, easy on-site assembly, ideal for regular grids — most popular for roofs and canopies...

Read more