Pre-Installation Preparation prior to the construction of Steel Building - Knowledge
Pre-Installation Preparation prior to the construction of Steel Building(Week 0) 1.Site leveling and foundation curing (anchor bolts positioned per shop drawing)...

1.Site leveling and foundation curing (anchor bolts positioned per shop drawing)
2.Tool and equipment checklist: crane, torque wrench, scaffolding, safety gear
3.Component inspection on delivery: check quantity, damage, bolts and drawings
4.Foundation bolt verification: positions, elevation, tolerance ±2mm before steel erection