Steel Frame Warehouse Project in Kyrgyzstan - News

This steel frame warehouse project is located in Kyrgyzstan, covering a total area of 5,000 ㎡. It adopts a full steel frame structure system. All steel components are standardized and prefabricated in the factory, and the main structure can be completed by hoisting and splicing on site. With high construction efficiency and...

Steel Frame Warehouse Project in Kyrgyzstan
This steel frame warehouse project is located in Kyrgyzstan, covering a total area of 5,000 ㎡. It adopts a full steel frame structure system. All steel components are standardized and prefabricated in the factory, and the main structure can be completed by hoisting and splicing on site. With high construction efficiency and controllable period, it can quickly achieve structural topping-out to adapt to local construction rhythm. The steel structure has high strength and good integrity, well coping with the large temperature difference in Central Asia, and is stable and durable.

The building has a spacious and regular interior space without redundant columns. It can flexibly plan shelf layout and operation aisles according to operation needs, suitable for various storage scenarios such as cargo storage and logistics distribution, providing customers with cost-effective standardized warehouse solutions.