Phase 3 New Energy Industrial Gas Chemical Steel Structure Facility Project in Saudi Arabia - News

This Phase 3 new energy industrial gas chemical project is located in Saudi Arabia, covering a total area of 300,000 ㎡. It adopts heavy steel structure and produces industrial gas based on local green renewable energy. The project strictly follows international chemical safety and environmental standards, and the steel structure...

Phase 3 New Energy Industrial Gas Chemical Steel Structure Facility Project in Saudi Arabia
This Phase 3 new energy industrial gas chemical project is located in Saudi Arabia, covering a total area of 300,000 ㎡. It adopts heavy steel structure and produces industrial gas based on local green renewable energy. The project strictly follows international chemical safety and environmental standards, and the steel structure features excellent heat resistance, sandstorm resistance and corrosion resistance, fully adapting to the Middle East desert climate and new energy chemical production conditions.

The project includes a full set of steel support structures and supporting facilities such as reaction towers, storage tanks and process pipe racks. All steel components are factory prefabricated and modularly installed on site with high precision and controllable schedule. While ensuring large-scale gas production capacity, it practices green and low-carbon concepts, providing a solid industrial supporting carrier for the local new energy industry chain.